| Company Name |
|
| Contact Mode |
|
| Project Title |
|
| Equipment used for |
|
|
Residential
Office
Hotel
Factory
Commercial
Logistics Centre
Hospital
Others
|
| Quantity |
|
Delivery Date
|
Year
Month
Date |
| Load Capacity |
kg |
Speed
|
m/s |
| Floor/Stops/Door |
Floor/
Stop/
Door |
| Operating Mode |
With Attendant
Without Attendant
|
| No of Floors served |
|
Home Landing
|
No.
Floor |
| Fire Protection |
有
无 |
Lift Travelling Height
|
mm |
| Floor Height of the highest floor |
mm |
Pit Depth
|
mm |
| Hoistway Inner Dimensions |
(Width)
mm x (Depth)
mm |
| Sill Concrete Support |
Yes
No |
| Hoistway Concrete Structure Type |
Reinforced Concrete
Bricks
others
|
| Control System Mode |
Single
Dual
Multiple
|
| Hall Call Method |
|
| Car |
One Way Entry
Two Way Entry, Hall No
Requires 2 way entry.
|
| Clear Opening Dimensions |
(
Width
)
mm x (
Height
)
mm |
| Door Opening Mode |
Centre Opening
Double opening Left aligned
|
| Double Opening Right Aligned
Centre Opening and double stage
|
| Building Height |
mm
|
| Remarks |
|